For a 200×1800 mm graphite electrode, verify the drawing, tolerances, thread dimensions, and inspection method before comparing quotations. World Steel Association’s World Steel in Figures 2024 reports 1,892.2 million tonnes of crude steel production in 2023; electric-arc furnaces accounted for about 28.6%. This scale makes consistent electrode supply important, but it does not prove any single supplier’s capability. Ask for recent test records covering resistivity, bulk density, flexural strength, and dimensional checks. ASTM C611 and ASTM C1025 provide recognized methods for measuring electrical resistivity and modulus of rupture. A tidy certificate is not enough.
Traceability should connect each finished electrode to its raw-material batch, forming date, baking and graphitization records, machining inspection, and shipment documents. Request a sample batch record and check whether its identifiers match the product markings and packing list. During an audit, compare written procedures with actual shop-floor labels and measurement equipment. Small details matter. One weakness in this check is that polished documents can still hide inconsistent daily practice.
Capacity claims need similar scrutiny. Ask for monthly output specifically for the 200×1800 mm size, current lead time, planned maintenance, and recent on-time delivery performance. Confirm whether forming, baking, graphitization, and machining are controlled in-house or depend on outside suppliers. Review bottlenecks, not just total plant capacity: a large furnace may still leave machining as the limiting step. Capacity figures can be optimistic, so compare them with production schedules and shipment records.