| Product Standard Compliance | IEC 60947-6-1 for transfer switching equipment; UL 1008 where North American certification is required. | Valid certificates, test reports, scope of certification, and matching model numbers. | Confirms that the ATS has been evaluated for switching performance, insulation, temperature rise, and operating safety. | 15% |
| Rated Current Coverage | Product range should cover the project requirement, commonly from low-current distribution applications to high-current power systems. | Complete technical datasheets showing rated operational current, rated insulation voltage, and rated frequency. | Prevents the selection of an undersized switch that may overheat or fail under continuous load. | 10% |
| Transfer Performance | Published transfer time, return time, switching mode, and transition type must match the application. | Factory test records, timing test results, and documented open-transition or closed-transition configuration. | Transfer speed and transition behavior affect load continuity, generator coordination, and equipment protection. | 12% |
| Controller Functionality | Automatic, manual, and test modes; adjustable voltage and frequency thresholds; phase-loss and phase-sequence monitoring. | Controller manual, parameter list, wiring diagram, alarm list, and demonstration video or test record. | Flexible settings help the ATS operate correctly with utility supplies, generators, and sensitive loads. | 10% |
| Electrical Endurance | The supplier should state mechanical and electrical endurance values under defined test conditions. | Type-test report identifying switching category, load conditions, endurance cycles, and test method. | Endurance data indicates expected service life and maintenance requirements. | 10% |
| Safety and Protection | Mechanical interlocking, electrical interlocking, over-voltage and under-voltage protection, and clear position indication. | Internal construction drawings, protection logic, risk assessment, and inspection checklist. | Interlocking reduces the risk of unintended parallel connection between normal and emergency sources. | 12% |
| Environmental Capability | Declared operating temperature, humidity, altitude, ingress protection, and vibration limits must suit the installation site. | Environmental test reports and datasheet values; confirm IP rating for the complete enclosure, not only internal components. | Environmental suitability improves reliability in electrical rooms, outdoor cabinets, industrial facilities, and generator rooms. | 8% |
| Quality Management System | ISO 9001 certification from an accredited certification body, with production controls relevant to electrical equipment. | Current certificate, certification scope, audit status, incoming inspection records, and final test procedures. | A controlled quality system reduces variation between production batches and supports corrective action. | 8% |
| Factory Testing and Traceability | Every finished ATS should receive documented routine tests before shipment. | Routine test report covering wiring, insulation resistance, dielectric withstand, functional transfer, and visual inspection. | Traceable testing helps identify production defects before the equipment reaches the installation site. | 8% |
| Customization and Integration | Support for auxiliary contacts, communication interfaces, bypass arrangements, enclosure options, and generator signals. | Approved drawings, interface lists, communication protocol documents, and sample configuration records. | Integration capability reduces redesign work and improves compatibility with building management or power monitoring systems. | 5% |
| After-Sales Support | Documented warranty terms, spare-parts availability, commissioning support, and response procedures. | Warranty document, service-level agreement, troubleshooting guide, spare-parts list, and technical support contacts. | Effective support reduces downtime during commissioning and future maintenance. | 7% |
| Commercial and Delivery Control | Transparent quotation, defined Incoterms, realistic lead time, export packaging, and consistent documentation. | Itemized quotation, production schedule, packing specification, inspection plan, and shipping documents. | Clear commercial controls reduce procurement risk, delivery delays, and unexpected project costs. | 5% |