| Factory Profile 01 | Heavy-duty steel garage shelving, boltless racks, utility storage units | Certificate reported Verify scope, expiry date, and issuing body | Dedicated forming, punching, welding, powder-coating, and assembly areas | Approx. 8,000–12,000 rack units | 25–35 days | 35–50 days | 100–300 units | ISO certificate; process flow; coating thickness records; load-test reports; recent inspection records | Medium |
| Factory Profile 02 | Adjustable garage shelving, metal cabinets, pegboard systems | Claimed Certificate copy and validity not independently confirmed | Medium-scale factory with outsourced surface treatment reported | Approx. 4,000–7,000 rack units | 30–40 days | 40–60 days | 200–500 units | Subcontractor list; coating supplier records; incoming-material inspection; carton drop-test evidence | Medium–High |
| Factory Profile 03 | Garage workbenches, storage cabinets, modular wall-mounted racks | Certificate reported Confirm whether the certificate covers manufacturing activities | Integrated sheet-metal fabrication and automated powder coating | Approx. 6,000–10,000 rack units | 28–38 days | 40–55 days | 100–300 units | Calibration certificates; weld inspection; salt-spray results; packaging specifications; corrective-action log | Medium |
| Factory Profile 04 | Light-duty boltless racks, plastic-and-steel garage organizers | Not publicly verified | Small-to-medium production site with mixed manual assembly | Approx. 2,000–5,000 rack units | 35–45 days | 50–70 days | 300–800 units | Factory registration; machine list; daily output records; material certificates; third-party pre-shipment inspection | High |
| Factory Profile 05 | Commercial garage racks, pallet-style storage frames, heavy steel shelving | Certificate reported Check site address against certificate address | Large-scale facility with separate raw-material and finished-goods warehouses | Approx. 10,000–18,000 rack units | 25–35 days | 35–50 days | 100–300 units | Production planning records; steel coil traceability; load-deflection testing; warehouse inventory evidence | Low–Medium |
| Factory Profile 06 | Garage corner racks, folding shelves, compact storage systems | Claimed Scope and surveillance-audit status require confirmation | Flexible production lines suited to small and medium batches | Approx. 3,000–6,000 rack units | 30–45 days | 45–65 days | 100–300 units | Change-control procedure; sample approval records; assembly instructions; fastener torque records | Medium–High |
| Factory Profile 07 | Industrial garage shelving, tire racks, long-span storage racks | Certificate reported Verify current validity and product-category relevance | Heavy-gauge steel line with robotic welding reported | Approx. 7,000–14,000 rack units | 30–40 days | 40–60 days | 200–500 units | Welding procedure qualification; operator records; dimensional inspection; structural-load test methodology | Low–Medium |
| Factory Profile 08 | Retail-ready garage shelving kits, DIY racks, e-commerce packaging | Not publicly verified | Assembly-focused operation with packaging and labeling capability | Approx. 4,000–8,000 rack units | 35–50 days | 50–75 days | 500–1,000 units | Packaging line audit; barcode controls; carton compression test; fulfillment accuracy; product traceability | High |
| Factory Profile 09 | Premium powder-coated shelving, modular cabinets, wall storage panels | Certificate reported Confirm certificate number through the issuing organization | Mid-to-large facility with in-house design and tooling support | Approx. 6,000–11,000 rack units | 28–40 days | 40–55 days | 100–300 units | Design-change records; tooling maintenance; color-master approval; coating adhesion and impact tests | Medium |
| Factory Profile 10 | OEM garage storage systems, branded private-label racks, mixed metal organizers | Claimed Independent document verification required | Multi-line OEM facility with mixed in-house and subcontracted processes | Approx. 5,000–10,000 rack units | 30–45 days | 45–70 days | 200–500 units | Subcontractor audit; capacity-loading plan; bill-of-material control; export documentation; reference orders | Medium–High |